Case Studies

330 Collins Street

Melbourne

Duration: 3 Months

Cladding Rectification

The team successfully removed and installed cladding on one elevation of the building. The presence of existing sunshades posed a significant challenge, requiring careful planning and execution. Despite these complexities, the work was completed within the agreed timeframe and to a high standard of quality. To ensure efficient documentation throughout both the investigation and installation phases, the client's software platform was adopted, streamlining communication and reporting.

Scope of work:

  • As built investigation

  • Removal and installation of over 1000m2 aluminium cladding

Outcomes:

  • Work completed safely and efficiently

  • Satisfied client

  • Removed flammable cladding to improve the safety of tenants

ARTC

Victoria, South Australia & New South Wales

Duration: 2 Months

Rail Bridge Inspections

Tradetech Rope Access supported the engineering team by providing safe access solutions and stand-by rescue services during a large-scale national bridge inspection programme. Each bridge presented unique challenges, requiring the team to think critically and develop tailored access and rescue plans specific to each structure. Their adaptability and commitment to safety were key to the successful delivery of the programme.

Scope of work:

  • Provide access and stand-by rescue services for rope access engineers to inspect rail bridge structures

Outcomes:

  • Safe and efficient access provided to over 30 bridges

  • Enabled Engineers to inspect the structures to collect information on current condition

20-22 Lt Bourke Street, Melbourne

Duration: 5 Months

City Limits Hotel

Remedial Repairs

Tradetech carried out comprehensive remedial repairs to the entire building envelope. To ensure public safety and maintain uninterrupted access to the hotel’s main entrance, a protective gantry was constructed at the front of the building. All works were undertaken while the hotel remained fully operational, with minimal disruption to guests and staff. Structural repairs to the façade were completed in accordance with the engineer’s technical specifications. As a result, the exterior of the hotel was transformed from a run-down appearance to a clean, well-maintained finish.

Scope of work:

  • Concrete repairs

  • Render repairs

  • Blasting and protective coatings of A/C grills

  • Sealant applications

  • Protective coatings to masonry

Outcomes:

  • Extended asset lifespan

  • Enhanced building aesthetics

  • Work completed within agreed programme

  • Minimal disruptions for fully operational hotel

  • Satisfied client

Olympic Boulevard, Melbourne

Duration: 1 Month

John Cain Arena

Protective Coating Application

Melbournian winter. Environmental factors were closely monitored throughout the project to ensure all works were carried out in accordance with the Inspection and Test Plan (ITP). Complex access requirements added to the project’s difficulty, but the site team embraced the challenge and successfully completed the works ahead of schedule.

Scope of work:

  • Localised corrosion treatment on steel rails

  • Application of protective coatings

Outcomes:

  • Work completed ahead of schedule

  • Comprehensive testing ensured high quality application

152 Elizabeth Street, Melbourne

Duration: 12 Months

London Stores

Extensive Structural Repairs

This large-scale project saw Tradetech manage all aspects from start to finish. The scope involved extensive structural repairs to a fully operational office building, with noise-sensitive tasks scheduled during early mornings and weekends to minimise disruption to tenants and staff.

All works were closely monitored and approved by a superintendent, ensuring strict adherence to quality standards. The broad and complex scope included rigging operations to safely remove a heavy, redundant steel structure located above some of Melbourne’s busiest streets, welding to restore the structural integrity of the concrete structure, and the application of protective coatings to both steel and masonry elements.

Scope of work:

  • Render pinning

  • Concrete repairs

  • Crack repairs

  • Removal of redundant steel rail

  • Protective coatings to masonry

  • Steel treatment and protective coatings to window frames

Outcomes:

  • Restored structural integrity to building

  • Extended asset lifespan

  • Work completed within agreed programme 

  • All works deemed satisfactory by Superintendent

  • Minimal impact for tenant within the building 

Redmond Barry Building, University of Melbourne

Facade Remediation

17 Spencer Road, Parkville

Duration: 4 Months

Tradetech Rope Access successfully completed a full façade restoration project that included weather sealing of all windows, concrete repairs, and the application of protective coatings. The team operated under strict site rules, allowing the works to be carried out safely during the school term. Existing sunshades presented significant access challenges; however, through careful planning and execution, the project was completed safely, efficiently, and to a high standard.

Scope of work:

  • Concrete repairs

  • Sealant application

  • Protective coatings to concrete

Outcomes:

  • All work deemed satisfactory by Superintendent

  • Minimal disruption to fully operational university building

  • Improved waterproofing

  • Restored structural integrity of building 

Altona

Duration: 2 Weeks

Tank Maintenance

Tank Cleanout & Repairs

The team carried out a range of maintenance and repair works on a storage tank during a planned shutdown. Through excellent site coordination and precise execution, all tasks were completed on schedule, enabling the tank to return to production without delay. All works were performed under strict confined space entry protocols, ensuring the highest standards of safety and compliance throughout the project.

Scope of work:

  • Manage confined space access

  • Clean out media from tank

  • Internal inspection

  • Steel repairs

Outcomes:

  • Work completed within time allocated 

  • Satisfied client

  • Minimal operational disruption

Melbourne

Duration: 1 Month

West Gate Bridge

Inspection + Core Sampling

During a night shift requiring a West Gate Bridge lane closure, an underbridge inspection unit was utilised to access the top of the piers. This allowed the team to safely rig ropes and establish access from below for the remainder of the project. The survey was carried out methodically and safely, with no further interruptions to the asset owner’s operations. Valuable data was collected to support further structural assessments and future maintenance planning.

Scope of work:

  • Full cover meter survey

  • Visual and tactile inspection

  • Core sampling 

Outcomes:

  • Provided engineers with comprehensive data to plan future protection of asset

  • No incidents were recorded during the project, and all environmental controls were effectively maintained throughout the works.