Case Studies
330 Collins Street
Melbourne
Duration: 3 Months
Cladding Rectification
The team successfully removed and installed cladding on one elevation of the building. The presence of existing sunshades posed a significant challenge, requiring careful planning and execution. Despite these complexities, the work was completed within the agreed timeframe and to a high standard of quality. To ensure efficient documentation throughout both the investigation and installation phases, the client's software platform was adopted, streamlining communication and reporting.
Scope of work:
As built investigation
Removal and installation of over 1000m2 aluminium cladding
Outcomes:
Work completed safely and efficiently
Satisfied client
Removed flammable cladding to improve the safety of tenants
ARTC
Victoria, South Australia & New South Wales
Duration: 2 Months
Rail Bridge Inspections
Tradetech Rope Access supported the engineering team by providing safe access solutions and stand-by rescue services during a large-scale national bridge inspection programme. Each bridge presented unique challenges, requiring the team to think critically and develop tailored access and rescue plans specific to each structure. Their adaptability and commitment to safety were key to the successful delivery of the programme.
Scope of work:
Provide access and stand-by rescue services for rope access engineers to inspect rail bridge structures
Outcomes:
Safe and efficient access provided to over 30 bridges
Enabled Engineers to inspect the structures to collect information on current condition
20-22 Lt Bourke Street, Melbourne
Duration: 5 Months
City Limits Hotel
Remedial Repairs
Tradetech carried out comprehensive remedial repairs to the entire building envelope. To ensure public safety and maintain uninterrupted access to the hotel’s main entrance, a protective gantry was constructed at the front of the building. All works were undertaken while the hotel remained fully operational, with minimal disruption to guests and staff. Structural repairs to the façade were completed in accordance with the engineer’s technical specifications. As a result, the exterior of the hotel was transformed from a run-down appearance to a clean, well-maintained finish.
Scope of work:
Concrete repairs
Render repairs
Blasting and protective coatings of A/C grills
Sealant applications
Protective coatings to masonry
Outcomes:
Extended asset lifespan
Enhanced building aesthetics
Work completed within agreed programme
Minimal disruptions for fully operational hotel
Satisfied client
Olympic Boulevard, Melbourne
Duration: 1 Month
John Cain Arena
Protective Coating Application
Melbournian winter. Environmental factors were closely monitored throughout the project to ensure all works were carried out in accordance with the Inspection and Test Plan (ITP). Complex access requirements added to the project’s difficulty, but the site team embraced the challenge and successfully completed the works ahead of schedule.
Scope of work:
Localised corrosion treatment on steel rails
Application of protective coatings
Outcomes:
Work completed ahead of schedule
Comprehensive testing ensured high quality application
152 Elizabeth Street, Melbourne
Duration: 12 Months
London Stores
Extensive Structural Repairs
This large-scale project saw Tradetech manage all aspects from start to finish. The scope involved extensive structural repairs to a fully operational office building, with noise-sensitive tasks scheduled during early mornings and weekends to minimise disruption to tenants and staff.
All works were closely monitored and approved by a superintendent, ensuring strict adherence to quality standards. The broad and complex scope included rigging operations to safely remove a heavy, redundant steel structure located above some of Melbourne’s busiest streets, welding to restore the structural integrity of the concrete structure, and the application of protective coatings to both steel and masonry elements.
Scope of work:
Render pinning
Concrete repairs
Crack repairs
Removal of redundant steel rail
Protective coatings to masonry
Steel treatment and protective coatings to window frames
Outcomes:
Restored structural integrity to building
Extended asset lifespan
Work completed within agreed programme
All works deemed satisfactory by Superintendent
Minimal impact for tenant within the building
Redmond Barry Building, University of Melbourne
Facade Remediation
17 Spencer Road, Parkville
Duration: 4 Months
Tradetech Rope Access successfully completed a full façade restoration project that included weather sealing of all windows, concrete repairs, and the application of protective coatings. The team operated under strict site rules, allowing the works to be carried out safely during the school term. Existing sunshades presented significant access challenges; however, through careful planning and execution, the project was completed safely, efficiently, and to a high standard.
Scope of work:
Concrete repairs
Sealant application
Protective coatings to concrete
Outcomes:
All work deemed satisfactory by Superintendent
Minimal disruption to fully operational university building
Improved waterproofing
Restored structural integrity of building
Altona
Duration: 2 Weeks
Tank Maintenance
Tank Cleanout & Repairs
The team carried out a range of maintenance and repair works on a storage tank during a planned shutdown. Through excellent site coordination and precise execution, all tasks were completed on schedule, enabling the tank to return to production without delay. All works were performed under strict confined space entry protocols, ensuring the highest standards of safety and compliance throughout the project.
Scope of work:
Manage confined space access
Clean out media from tank
Internal inspection
Steel repairs
Outcomes:
Work completed within time allocated
Satisfied client
Minimal operational disruption
Melbourne
Duration: 1 Month
West Gate Bridge
Inspection + Core Sampling
During a night shift requiring a West Gate Bridge lane closure, an underbridge inspection unit was utilised to access the top of the piers. This allowed the team to safely rig ropes and establish access from below for the remainder of the project. The survey was carried out methodically and safely, with no further interruptions to the asset owner’s operations. Valuable data was collected to support further structural assessments and future maintenance planning.
Scope of work:
Full cover meter survey
Visual and tactile inspection
Core sampling
Outcomes:
Provided engineers with comprehensive data to plan future protection of asset
No incidents were recorded during the project, and all environmental controls were effectively maintained throughout the works.